Monday, July 25, 2016

Asphalt Paving Completed. Landscape Restoration Being Scheduled

Work Completed Last Week, July 18th to July 22nd 
·         Completed grading of areas disturbed by construction
·         Continued installation and grading of topsoil
·         Final cleaning and work to prepare for paving the final layer of asphalt pavement
·         Applying layer of tack coat (oil) and sand prior to asphalt paving
·         Asphalt surface paving

Work Remaining to be completed
·         Installation and grading of topsoil
·         Sod Installation
·         Driveway restorations

Now that the final layer of asphalt surface has been paved, the most significant items remaining to complete are sod installation and asphalt driveway restoration.

The asphalt driveway restorations are being scheduled and should be completed in the near future.

We are still determining the best option for sod installation.  At this time, the contractor has indicated they would like to install the sod and perform heavy watering to ensure the sod lives and a healthy stand of grass is established. We are continuing to monitor the weather conditions and discuss the best option with the contractor. Once a final schedule is determined, we will be sure to pass the information along.

Hopefully you are happy with the improvements to your neighborhood and once the final items are completed, your lawns will be restored to looking the way they did prior to the work beginning.

Friday, July 15, 2016

Asphalt Surface Paving Scheduled for Next Week

Work Completed Last Week, July 11th to July 15th
·         Rough grading of areas disturbed by construction activities
·         Final testing of underground utilities
·         Internal televising of underground sewers
·         Adjusting structures to final grade
·         Walk-through with Village staff to find any items that need additional work
·         Made minor repairs at locations identified by Village staff

Work Anticipated to be completed Next week, July 18th to July 25th 
·         Complete grading of areas disturbed by construction
·         Installation and grading of topsoil
·         Asphalt surface paving

The contractor has completed the final testing and work associated with the underground utility portions of the project. The contractor has started some minor grading of the areas disturbed during construction. The contractor will continue to perform grading of disturbed areas as well as installation and final grading of topsoil. The timing of the sod installation is still being determined. Due to the hot and dry weather the past few weeks, this is not the optimum time to install sod. Should the sod installation be delayed to a time with more favorable growing conditions, we will let you know when the sod installation is scheduled to occur.

Paving of the asphalt surface layer is scheduled for next week. Additional information will be provided when the schedule is finalized regarding travel cautions and restrictions during the paving operations and prior when the existing asphalt will have a thin layer of oil sprayed on it.

Thanks again for all your patience, understanding, and cooperation during the construction project.

Friday, July 1, 2016

First Layer of Asphalt Pavement Installed

Work Completed Last Week, June 27th to July 1st  
·         Completed concrete curb & gutter, sidewalk, and driveway apron replacements that were damaged during construction or in poor condition.
·         Removed existing pavement in preparation for new asphalt pavement
·         Performed repairs to existing materials to provide suitable material under pavement as needed
·         Graded existing materials in preparation for new asphalt pavement
·         Installed first layer of asphalt pavement
·         General site clean-up prior to July 4th Holiday

Work Anticipated to be completed Next week, July 4th to July 8th
·         No work on-site on July 4th
·         Rough grading of areas disturbed by construction activities
·         Grading and installation of topsoil
·         Restore disturbed areas with sod
·         Final testing of underground utilities

The installation of the first layer of asphalt pavement is a major project milestone. Now that the first layer of asphalt is installed, the amount of dust is greatly reduced and a smooth driving surface is provided.

Thank you again for all your patience and understanding have you have been dealing with the dust and uneven roadway for the past few months. Thank you also for having your vehicles out of your driveways during the day to allow for the asphalt pavement removal and asphalt paving operations. Your cooperation was appreciated.

The contractor will not be on-site over the July 4th Holiday. Have a safe and enjoyable Holiday Weekend!!!